OUR FEATURED PROJECTS
Project
Experience
Tonic Group takes pride in its portfolio of diverse projects that showcase our expertise and commitment to excellence. From fixed plant drainage to bridge remediation and conveyor sensors, each project has its unique challenges and solutions that define its success. Our portfolio represents our dedication to delivering high-quality construction services that exceed expectations and contribute to the growth of our clients' businesses.
Client : Civmec / Main Roads WA
Brookton Highway Drainage Works
Location:
Brookton WA
Duration:
6 months
Scope:
General and detailed earthworks, formwork erection, reinforcing/steel fixing, concreteplacement, installation of drainage culverts/pipes and headwalls over 27kms of rural highway.

Client : Civmec
Albemarle Lithium Plant
Location:
Kemerton SIA (WA)
Duration:
12 months
Scope:
General and detailed earthworks, formwork erection, reinforcing/steel fixing, and concrete placement. Works conducted site wides across all construction areas.

Client : Mineral Resources
Carina Airport
Location:
Carina Mine Site (Eastern Goldfields)
Duration:
3 months
Scope:
Rectification of airport drainage and erosion issues along the 1.4km runway footprint. Removal of existing subgrade material, import and placement of engineered fill, reshaping of spillways and swale drains to ensure water shedding from the tarmac area.

Client : Protective Coating Systems (PCS/CCS)
Albemarle Lithium Plant
Location:
Kemerton SIA (WA)
Duration:
10 months
Scope:
General and detailed earthworks, formwork erection, reinforcing/steel fixing and concrete placement and general building maintenance works across multiple disciplines.

Client : Albemarle
Albemarle Lithium Plant
Location:
Kemerton SIA (WA)
Duration:
3 months
Scope:
General and detailed earthworks, formwork erection, reinforcing/steel fixing, and concrete placement. Works conducted site wides across all construction areas.

Client : BHP - Nickel West
Ammonium Nitrate Facility
Location:
Mt Keith Operations
Duration:
9 months
Scope:
Construction of a AN facility consisting of cement stabilisation of an 18,000m² hardstand area including bulk earthworks and detailed earthworks, formwork erection, reinforcing/steel fixing, concrete placement, and plant & equipment installation.


Client : BHP Whaleback
Primary Crusher Drainage Rectification
Location:
Whaleback (Newman)
Duration:
2 months
Scope:
Drainage works associated with the undermining of a Primary Crusher conveying system take-up tower. Works included, preparatory excavations and earthworks to excise existing
drainage and water infrastructures, supply, and installation of 450mm HDPE pipe works and valving, excavation and making good of multiple road crossings. Installation of headwalls, diversion drains with stone pitching to aid in water shedding for the crusher area.
